REHABILITATION OF GHOGHOBERIDZE STREET

The damaged layer of asphalt on a 440-meter-long street was raked and the damaged soil removed; sand-gravel mixture and fractured pebbles is now being used to create a foundation for the road. After completion of works on foundation, two layers of asphalt concrete will be laid; in order to protect the foundation of the road, concrete cuvettes will be built in on its sides; sidewalks and driveways to the yards will be arranged.